它的来源是指在工程建设项目中,为了确保质量和项目进度,会对工程各项活动进行编制预算和定量,以确保项目质量和进度的合理性。
例句1:The engineering quota for the construction of the bridge was set at $10 million.
翻译:这座桥梁的工程定额设定在1千万美元。
例句2: The engineering quota for the installation of the electrical system was revised due to the changes in the project scope.
翻译:由于项目范围的变化,安装电气系统的工程定额已经修订。

扫码进群(如群满请谅解)
长按或截屏保存,再用微信扫一扫
最佳回答 2023-02-18